Technical DataPlant ConfigurationBlock 1 (VEGA209)2 EGT Frame 9171E Gas Turbines (Rated at 130MW each) 1 GEC Steam Turbine (Rated at 140MW) Block 2 (VEGA309)3 EGT Frame 9171E Gas Turbines (Rated at 130MW each) 1 GEC Steam Turbine (Rated at 210MW) Combined Nominal Capacity 1000MWBoilers5 Stein Industrie vertical, unfired, 2 pressure Heat Recovery Steam Generators. (HP 73 bar, 508°C; LP 7 bar, 221°C) Cooling SystemMain - Direct cooling from River Thames (1.8 million cubic metres per day) via 3.8 m diameter intake and outfall tunnels 40m below the ground surface. Standby - Forced draft cooling towers Fuel SupplyMain - Natural gas fuel from Centrica is supplied through a dedicated 19.8km, 24" pipeline linked into the BG National Transmission System at Horndon-on-the-Hill. Standby - Distillate oil delivered by ship. Electrical ConnectionConnection Point National Grid 275kV/400kV Barking Substation Private Circuits Two 275kV private circuits 2.6km long link the power station and the Barking Substation. DimensionsSite 15.3 hectares (38 acres) Turbine Hall 335m long, 22m wide, and 24mhigh Stacks Two 55m tall stacks with separate flues for each gas turbine | The Combined Cycle
![]() |
Barking Power Limited is a company incorporated in England with registration number 02354681 and whose registered office is at Barking Power Station, Chequers Lane, Dagenham, Essex, RM9 6PF.